亚洲精品1234,久久久久亚洲国产,最新久久免费视频,我要看一级黄,久久久性色精品国产免费观看,中文字幕久久一区二区三区,久草中文网

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Shanghai East Railway Station completes 9,000-ton steel roof lift

By Zheng Zheng in Shanghai | chinadaily.com.cn | Updated: 2026-05-14 17:07
Share
Share - WeChat

A 9,000-ton steel structural roof truss was lifted 13.5 meters into position at Shanghai East Railway Station on Thursday, marking a milestone in the project with construction now moving to metal roofing installation.

The 14-hour installation was the largest single roof section ever lifted at a Chinese railway station, covering 74,000 square meters, equivalent to 176 basketball courts.

The roof employs a double-curved spatial truss grid system. Upon completion, the entire roof structure will span 390 meters east-west and 335 meters north-south, covering a total area of 113,000 square meters through 119 diamond-shaped units.

A 9,000-ton steel structural roof truss is lifted 13.5 meters into position at Shanghai East Railway Station. [Photo by Gao Erqiang/chinadaily.com.cn]
1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US