亚洲精品1234,久久久久亚洲国产,最新久久免费视频,我要看一级黄,久久久性色精品国产免费观看,中文字幕久久一区二区三区,久草中文网

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

Updated: 2014-04-01

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.