亚洲精品1234,久久久久亚洲国产,最新久久免费视频,我要看一级黄,久久久性色精品国产免费观看,中文字幕久久一区二区三区,久草中文网

 
 

Home/News

Two tunnels completed in Paute-Sopladora Hydropower Station, Ecuador

Updated: 2012-12-04

CGGC has recently completed the construction of a water discharge tunnel in the central section and the No.2 branch tunnel for water diversion of Paute-Sopladora Hydropower Station in Ecuador.

With the completion of the two tunnels, the interconnection chamber area and the L1 area were connected. It provided the working interface and ample time for the excavation of the interconnection chamber and shaft, and accelerated the progress of the discharge tunnel construction.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.