亚洲精品1234,久久久久亚洲国产,最新久久免费视频,我要看一级黄,久久久性色精品国产免费观看,中文字幕久久一区二区三区,久草中文网

Global EditionASIA 中文雙語(yǔ)Fran?ais
Business
Home / Business / Industries

HSR makes new progress in Southwest China

By Yin Minyue | chinadaily.com.cn | Updated: 2026-05-09 16:01
Share
Share - WeChat
Builders from China Railway No 4 Engineering Group start laying tracks on May 8 for the Yibin-Yanjin South section of Chongqing-Kunming High-speed Railway, helping to bolster social-economic development along the route. [Photo provided to chinadaily.com.cn]

Amid the country's drive to expand the operating mileage of railways, builders from China Railway No 4 Engineering Group (CREC4) have begun laying tracks for a new high-speed railway in Southwest China.

CREC4 builders began laying the first set of 500-meter-long steel rails on May 8 in Yibin, Sichuan province, officially kicking off the commencement of the full track-laying project for the Yibin-Yanjin South section of Chongqing-Kunming HSR.

Li Zhongqiang, CREC4's technical leader of track laying for the project, said as a crucial component of China's "Eight Vertical and Eight Horizontal" HSR network, the Chongqing-Kunming HSR starts from Chongqing West Station — and after traversing Chongqing municipality, Sichuan, Guizhou, and Yunnan provinces — ends at Kunming South Station, spanning some 700 kilometers with a designed speed of 350 kilometers per hour.

Divided into three sections for construction — the Chongqing-Yibin section (Chongqing West to Yibin), the Sichuan-Yunnan section (Yibin to Yanjin South), and the Yunnan section (Yanjin South to Kunming South Station) — the Chongqing-Yibin section has been in operation since Sept 29, 2024, while the Sichuan-Yunnan and Yunnan sections are progressing in an orderly manner, Li said.

He added that the total track laying (including station lines) for the Yibin-Yanjin South section extends some 157 kilometers, with about 152.4 kilometers for the main line and 4.64 kilometers for the station lines.

"The terrain features significant undulations and is characterized by numerous long tunnels, limited working space, and multiple blind spots in communication and signaling along the route," Li's colleague, Deng Yutao, noted.

The CREC4 builders have put into place 32 fixed group cranes, 80 railway flatbed vehicles, two DF4B locomotives, one ballastless track laying unit, and two mobile flash welding machines to ensure the full success of the track-laying engineering, Deng said.

1 2 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE